MAR
2022
A new Boen 13 x 181 x 2200mm engineered floor was installed in a House of Fraser concession area within London
The existing flooring suffered water damage and needed to be replaced, this was removed and the new Boen floor was to be installed. A new plywood subfloor was installed to raise the height before the new flooring was installed. The original floor trims were used along with new Gradus trims
Continue Reading →
An existing Church floor was sanded and resealed at Olton Friary, Solihull, Birmingham to bring it back to looking almost new.
The floor was sanded to a fine finish and then had 1 base coat of Bona Classic Prime and 3 top coats of Bona Traffic HD floor lacquer applied.
Continue Reading →