Wolverhampton Girls High School, Wolverhampton

Mark at Wolverhampton Girls High School contacted us to restore existing flooring in two areas by the main reception area.

We arrived at the school and we uplifted the loose parquet blocks in the two areas, cleaned out any debris from the previous adhesive used to stick the blocks down.

The blocks were then refitted into place using Bona R484 silane adhesive and allowed to dry prior to the next step.

The floor was then sanded to a fine finish and had one ...

Continue Reading →
0

Anstice Club Madley, Telford, Shropshire

We were instructed by Andy at Madeley Town Council to undertake the renovation of the existing maple wood flooring in the Anstice Club in the centre of Madley.

We had to fully sand the existing floor finish off and then repair and also replace up to twenty 57mm maple boards .  Once the repairs had been fully completed and the floor sanded to a fine finish, we then applied one base coat of Junckers primer followed by top coats of Junckers HP Commercial floor ...

Continue Reading →
0

Parquet Block Floor Edgbaston, Birmingham

We were asked to supply and install a prime grade solid oak parquet herringbone floor to a hallway in Edgbaston, Birmingham.
The existing flooring was removed and we needed to install a layer of self levelling latex and an epoxy dpm before the blocks could be installed.
The prime grade solid oak parquet blocks had been acclimatising for 14 days prior to the installation close to where they were to be installed.

Once the oak parquet had been installed, the 1 ...