St Paul’s Church, Great Barr Birmingham

We were contacted by St Paul's Church, Great Barr to take up an existing water damaged wood floor and install a new replacement solid oak parquet block floor. The original Iroko parquet block floor was removed and the existing floor had a self levelling latex and an epoxy dpm installed. We then installed new prime grade oak parquet block flooring to the whole floor area and sanded and resealed the floor using a base coat of Bona Prime Classic followed by 3 top coats of Bona Traffic HD water based floor lacquer.    
 
0